Remarks: The new and futuristic ATC tower at Mumbai airport. Although behind schedule the construction is now complete and it is expected to be operational by Sept 2013. Click here to see pic of the tower when it was under construction. Once operational, it will replace this old ATC tower next RWY 14.
Remarks: The economy section of the Airbus A321 of Air India pictured after landing at Mumbai Chhatrapati Shivaji International Airport, operating as flight AI 658 on CCJ-CJB-BOM-DEL route. These 321s are configured as 20J/152Y with a 40" seat pitch in J and 32" seat pitch in Y and with PTVs at the back of every seat.
Remarks: Wing view of the Air India hangars at Mumbai Chhatrapati Shivaji International Airport. This is no ordinary picture as when you view it in full size, you actually realize the aircrafts at the hangars are the Dream)Liners. Picture taken during the days of the Boeing 787 grounding.
Trivia: Can someone give me the exact count of aircrafts in this picture?
Remarks: Terminal 1C along with the new ATC tower coming up on the left, and the existing tower at the right edge of the frame. [Canon EOS 40D + Sigma 17-70mm f/2.8-4.5 DC IF Macro]